BASF Power Factor Correction Study

Petro Min Engineers have been awarded a Power Factor correction study by BASF. The study relates to their chemical manufacturing facility in Kwinana as part of their ongoing energy savings and cost reduction program.

This work will involve site measurements and evaluation of cost benefits in installing power factor correction facilities throughout the site.