{"id":751,"date":"2019-10-09T06:16:59","date_gmt":"2019-10-09T06:16:59","guid":{"rendered":"https:\/\/www.petromineng.com.au\/?p=751"},"modified":"2021-08-11T13:29:44","modified_gmt":"2021-08-11T05:29:44","slug":"sandy-hollow-4-9-mwatt-solar-pv-system-hunter-valley-nsw","status":"publish","type":"post","link":"https:\/\/www.petromineng.com.au\/blog\/sandy-hollow-4-9-mwatt-solar-pv-system-hunter-valley-nsw\/","title":{"rendered":"Sandy Hollow 4.9 MWatt Solar PV system in the Hunter Valley in NSW"},"content":{"rendered":"

 <\/p>\n

 <\/p>\n


\n

Petro Min Engineers are currently working with Cardno to provide engineering and design services for the network connection application to Ausgrid for a 4.9 MW AC solar facility using a SMA MVPS4950 central inverter.<\/p>\n

The work as part of PME\u2019s scope includes;<\/p>\n