{"id":959,"date":"2021-07-16T14:32:13","date_gmt":"2021-07-16T06:32:13","guid":{"rendered":"https:\/\/www.petromineng.com.au\/?p=959"},"modified":"2021-09-16T22:56:10","modified_gmt":"2021-09-16T14:56:10","slug":"synergy-100mw-200mwh-big-battery","status":"publish","type":"post","link":"https:\/\/www.petromineng.com.au\/blog\/synergy-100mw-200mwh-big-battery\/","title":{"rendered":"Synergy 100MW\/200MWh Big Battery"},"content":{"rendered":"\n

Petro Min Engineers are working with NAOH \/Engie as the owners engineers for the Synergy 100 Mega Watt Battery Energy Storage System and High Voltage substation in Kwinana Western Australia.<\/p>\n\n\n\n

The project is the early design development stage and we look forward to continuing our involvement through to construction and commissioning of the complete facility.<\/p>\n\n\n\n

<\/p>\n","protected":false},"excerpt":{"rendered":"

Petro Min Engineers are working with NAOH \/Engie as the owners engineers for the Synergy 100 Mega Watt Battery Energy Storage<\/p>\n","protected":false},"author":3,"featured_media":752,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.petromineng.com.au\/wp-json\/wp\/v2\/posts\/959"}],"collection":[{"href":"https:\/\/www.petromineng.com.au\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.petromineng.com.au\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.petromineng.com.au\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.petromineng.com.au\/wp-json\/wp\/v2\/comments?post=959"}],"version-history":[{"count":0,"href":"https:\/\/www.petromineng.com.au\/wp-json\/wp\/v2\/posts\/959\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.petromineng.com.au\/wp-json\/wp\/v2\/media\/752"}],"wp:attachment":[{"href":"https:\/\/www.petromineng.com.au\/wp-json\/wp\/v2\/media?parent=959"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.petromineng.com.au\/wp-json\/wp\/v2\/categories?post=959"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.petromineng.com.au\/wp-json\/wp\/v2\/tags?post=959"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}