Petro Min Engineers are currently working with Cardno to provide engineering and design services for the network connection application to Ausgrid for a 4.9 MW AC solar facility using a SMA MVPS4950 central inverter.
The work as part of PME’s scope includes;
- 33kV network connection design;
- Earthing and lightning protection system design;
- Electrical protection systems design;
- Modelling of the system using PSSE;
- Power quality analysis;
- Site overall arrangement drawings;
- Assembly of a connection application to Ausgrid