The variable speed drive for Mount Gibson Iron unloading facility in Geraldton Port has been completed and shipped to site. PME where responsible for the detailed design and supply of the variable speed drive as an upgrade to a soft starter on the unloading conveyor. We design the interfaces with the existing controls and safet devices for a seamless change over.