BASF – Port Gregory plant at Hutt Lake

PME provided to Oracle, the electrical contractor, a HV design and HV submission to Western Power for the upgrade of a new 2,500 kVA transformer.

This included the earth grid design and step and touch potentials design and engineering

PME also went to site to provide final certification of the installation to the design and referenced standards

REACH OUT TO OUR ELECTRICAL ENGINEERING CONSULTANTS

CONTACT US