Petro Min Engineers were contracted by East Metropolitan Regional Council (EMRC) to perform the electrical design for the new waste sorting facility.

Key features of the works included;

  • Negotiations with Western Power for an upgraded power supply to the site.
  • Detailed design of a new substation and cabling to existing facilities as well as this new Commercial and Industrial Waste Sorting Facility power supply.
  • Electrical design of the fit out for the new building including low energy consumption LED high bays and external floodlighting
  • Fire detection and alarm system.
  • Electrical powered roller doors
  • New main switchboard within the Waste Sorting Facility building

Petro Min Engineers continued their involvement in the project with technical support during the tendering and construction phases of the work.