Petro Min Engineers have designed the switchboards, transfer switches and controls for a set of portable generator trailers for use by Western Australian Public Transport Authority.
These trailers were assembled by Avid Group, and include two separate Duty/Standby 25kVA generators, and two portable switchboards for connecting various loads.