Garnet Mining Australia (GMA) – Port Gregory MCC 04 Addition
Petro Min Engineers where contracted to review the electrical requirements for the addition of several process plant upgrades to the Port
Read moreGarnet Mining Australia (GMA) – Port Gregory Harmonic Filters
Due to a large number of variable speed drives on the 415 Volts system and an inherently weak 33kV electrical supply
Read moreShire Of Murchison Power Station and Water Supply Upgrade
Petro Min Engineers are excited to have been awarded two key infrastructure projects at the Shire of Murchison – Murchison Settlement
Read moreBASF – Port Gregory plant at Hutt Lake
PME provided to Oracle, the electrical contractor, a HV design and HV submission to Western Power for the upgrade of a
Read moreGarnet Mining Australia – Port Gregory Wet Plant Upgrades
Petro Min Engineers provided the engineering and design works for the following works on behalf of Garnet Mining Australia for their
Read moreGranny Smith – NKP Borefield
Petro Min Engineers successfully completed the detailed engineering and design of the new North Karingal Paleochannel (NKP) Borefield for Gold Fields
Read moreGranny Smith Gold Mine – Underground Workshop
Petro Min Engineers successfully completed the electrical and controls design for the Z110 Underground Workshop at the Granny Smith Gold Mine
Read more66kV and 33kV Substations for Mount Keith and Leinster Solar Farms
PME was contracted to provide the design of two substations connecting utility scale solar farms in the Goldfields region in Western
Read more